Xugong 180 XCMG HZS180 mixing plant (used)
Xugong 180 – Basic Information
Model: XCMG HZS180 mixing plant (used)
Brand / Year: Xugong Group | Out of Factory in 2021
Location: Ganzhou, Jiangxi (can be separated and transported)
Trading Properties: 3 packs drop by 15%
Core Advantages (First Screen Strong Exposure)
Double production capacity
→ Single 180 m³/h | Three parallel 540 m³/hXugong ancestry
→ Original Electronic Control System + Check Device DNAExclusive configuration
→ 4 warehouse anti-mixed material design | 3 + 2 spiral grade deliveryZero Risk Commitment
→ 7 days trial period | 6 months core component warrant.
Configuration List (Foldable Layered Structure)
Main Structure
Xugong original stirring engine (residual life ≥ 85%)
Steel structure four warehouse batching machine (warehouse capacity 20m³ / warehouse)
Delivery Systems
Coarse aggregate: 3 Φ 323 screw machine (liner thickness ≥ 8mm)
Fine aggregates: 2 Φ 273 spiral machines (patented for dust sealing)
Power Units
37kW screw air compressor (40% energy saving compared to piston type.
📊 Data Comparison (Decision Accelerator)
Key Indicators | This Equipment | Industry Second-hand Average |
---|---|---|
Measurement Errors | ± 1.5% of aggregate | ± 1% of powder | Cement ± 3% | Powder ± 2% |
Failure Rate | 0.8 times / twang | 1.6 times / twang |
Time to Disassemble | 72 hours (modular design) | 120 hours |

Laboratory Highlights (Photo / Video Guide)
✅ Authentication, Performance & Proof of Attrition
Authentication
Xugong factory plaque (including high-resolution equipment coding)
2024 Third Party Detection Report (screenshot of key pages)
Performance Measurement
Video: Three simultaneous production of C30 / C40 / C50 concrete (with timer)
GIF: Four barn ingredients infrared anti-mixed alarm demonstration
Proof of Attrition
Thickness of blades measured comparison chart (scale close-up)
Table of operational current detection data for spiral motors
📢 Promotion Policy (Conversion Hook)
⏳ Time-limited Privilege
First 5 recipients: 28,000 worth of Xugong original factory spare parts gift kit
For customers in Chongqing and Chongqing: Free site planning services
💡 Flexible Buying of Equipment
Option A: Single purchase (30% down payment)
Program B: Three packages (includes sending machine labor)
Option C: Replacement of old equipment (online second valuation)
✅ Endorsing Trust (Eliminating Second-Hand Concerns)
1. Security of Tenure
Equipment Registration Certificate | Original Invoices (De-Sensitive Version)
China People’s Insurance Coverage (remaining 8 months)
2. Client Witness
“Three units contracted three sections of the China-Chongqing medium-distance high-speed railway” – China Railway XX Bureau
“The failure rate is 60% lower than the previous generation of devices” – Sichuan XX Business Mix
3. Commitment to Service
48-Hour Response to Aftersales
Lifetime Cost Price Supply of Spare Parts
📖 Required Reading Tips (Reduce Consultation Costs)
Suitable Scene: Daily demand 800–1500 m³ | Aggregate type 4
Caution: Site depth 50 meters requires renovation
Maintenance Advice: Check the rotting of the spiral lining every 5,000 corners
Special Note: Reject the assembly machine | Each individual file