22 Central European Union 120
[Suzhou Spots · 22 Year Container-type Zoom 120 Stations (Mobile Mixing Fort)]
✅ Disruptive design
Container-type structure | Whole machine protection level IP54, free from infrastructure construction.
Zoom 120 Host | Almost a new machine in 22 years. The original frequency converter system.
- Standard slope belt + steel structure loader
Zero deviation, strong resistance to natural weathering.
✅ A crush-level advantage
Production started in 7 days: The whole cabinet is free from disassembly, hanging to the floor → Power supply → Material.
Extra cost savings: Saving more than a new plane. 50% exemption of concrete foundation construction fees.
The All-Purpose Scene: Field construction marvels such as wind power / highways, 3 times faster turnaround.
✅ Locking machine for a limited time
Telephone number: 18679708936
Shaofu Storage Center, Jiangxi (Support) Whole cabinet light inspection.
⚠️ Gift: Container conversion drawings + fast turnaround schemes.
