Product

22 Central European Union 120

[Suzhou Spots · 22 Year Container-type Zoom 120 Stations (Mobile Mixing Fort)]

Disruptive design

  • Container-type structure | Whole machine protection level IP54, free from infrastructure construction.

  • Zoom 120 Host | Almost a new machine in 22 years. The original frequency converter system.

  • Standard slope belt + steel structure loader
    Zero deviation, strong resistance to natural weathering.

A crush-level advantage

  • Production started in 7 days: The whole cabinet is free from disassembly, hanging to the floor → Power supply → Material.

  • Extra cost savings: Saving more than a new plane. 50% exemption of concrete foundation construction fees.

  • The All-Purpose Scene: Field construction marvels such as wind power / highways, 3 times faster turnaround.

Locking machine for a limited time

  • Telephone number: 18679708936

  • Shaofu Storage Center, Jiangxi (Support) Whole cabinet light inspection.

⚠️ Gift: Container conversion drawings + fast turnaround schemes.